ADESIS TECHNICAL LIBRARY

Technical starting points for specifying the right product.

Define the process requirement before preparing the purchase list. These concise guides support vacuum engineering and advanced-material selection.

01

How to prepare a vacuum chamber RFQ

Define target pressure, process gases, envelope, ports, pumping, temperature and motion in one engineering checklist.

Open technical page →
02

KF, ISO and CF connections

Choose the flange family by serviceability, diameter, vacuum level, bakeout and seal material.

Open technical page →
03

Specifying sputtering targets

Review composition, purity, diameter, thickness, bonding and backing-plate requirements together.

Open technical page →
04

Choosing evaporation materials

Match pellets, granules, pieces or wire to source type, charge size and crucible compatibility.

Open technical page →
05

Preparing a wafer specification

Compare diameter, orientation, doping, finish, thickness, grade and packaging.

Open technical page →
06

Technical quotation workflow

See when Adesis designs and manufactures a system and when products are supplied under technical procurement.

Open technical page →
CLEAR SCOPE

Manufacturing and technical supply are stated separately.

Download chamber RFQ checklist

Adesis designs and manufactures custom vacuum chambers around process requirements. Standard vacuum components, wafers, targets, evaporation sources and other advanced materials are supplied with technical specification review. Compliance, documentation and delivery terms are confirmed during quotation.

CLEAR ANSWERS

Technical and commercial scope

Which products does Adesis manufacture?

Adesis designs and manufactures custom vacuum chambers around process requirements. Standard vacuum components and advanced materials are supplied to technical specification and may be integrated within a project scope.

What information is needed for a vacuum chamber quotation?

Target pressure, process, approximate geometry, ports, pumping, temperature, sample motion, instrumentation and test scope provide a practical starting point.

Can I request a non-listed target or evaporation material?

Yes. Submit composition, purity, dimensions, form, quantity and application through the custom RFQ notes.

Is analysis documentation available?

Analysis documentation is provided where applicable; document scope and any additional requirements are confirmed during quotation.